Anonymous

Tarantula: Difference between revisions

From YSTV History Wiki
m
no edit summary
(Some stuff ripped from the docswiki page)
 
mNo edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
Looking for usage documentation? Try [[docs:Tarantula]]
Tarantula was a project to replace [[Spider and SchedSeven]] with a better engineered, more functional and generally less awful system. Development started at the end of Summer 2011 with [[Michael Cullen]] designing quite a lot of the core and defining how a lot of the software would work before he left, and occasionally updating it over the following months. At the start of 2012 the project was put on hiatus.
Tarantula was a project to replace [[Spider and SchedSeven]] with a better engineered, more functional and generally less awful system. Development started at the end of Summer 2011 with [[Michael Cullen]] designing quite a lot of the core and defining how a lot of the software would work before he left, and occasionally updating it over the following months. At the start of 2012 the project was put on hiatus.


Line 4: Line 6:


A few more months of development saw the system go into production in late October of 2013, finally giving [[Emily Torricelli]], the [[Scheduling Manager]] something to do on the live channel.
A few more months of development saw the system go into production in late October of 2013, finally giving [[Emily Torricelli]], the [[Scheduling Manager]] something to do on the live channel.
[[Category:Tech Team History]]