175
edits
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
=Production= | =Production= | ||
YSTV covered the Shield event while LA1:TV covered the main Trophy event in the main auditorium. | YSTV covered the Shield event while [[LA1:TV]] covered the main Trophy event in the main auditorium. | ||
Rigging largely took place on the preceding Friday 17th by a smaller team. The main show was done by a much larger team, with a switching around of roles, with de-rigging afterwards. | Rigging largely took place on the preceding Friday 17th by a smaller team. The main show was done by a much larger team, with a switching around of roles, with de-rigging afterwards. | ||
The set-up in YSTV's room was a long row of desks at the back, with sound, graphics, vision mixing, live-stream computing, and directing all happening from there. There was a Teradek, wireless camera roaming around the room as well as the two stationary cameras at the front of the stage and the wide shot: just in front of the control desk. All the roles had people swapping around. | The set-up in YSTV's room was a long row of desks at the back, with sound, graphics, vision mixing, live-stream computing, and directing all happening from there. There was a Teradek, wireless camera roaming around the room as well as the two stationary cameras at the front of the stage and the wide shot: just in front of the control desk. All the roles had people swapping around. |