Michael Cullen: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 5: Line 5:
During his time in YSTV so far, he has already (perhaps foolishly) taken on several projects (in approximate order of level of completion):
During his time in YSTV so far, he has already (perhaps foolishly) taken on several projects (in approximate order of level of completion):


* [[Overlayed.net]]
* [[Overlayed.net]]
* Writing the officer reports and techie todo list part of the new website
* Writing the officer reports and techie todo list part of the new website
* [[Clock]] Rewrite to run on modern hardware and a re-rewrite in C++ and SDL which is much more awesome, the base of which was used at [[Elections_2010]] for the ticker bar and lower thirds.
* [[Clock]] Rewrite to run on modern hardware and a re-rewrite in C++ and SDL which is much more awesome, the base of which was used at [[Elections_2010]] for the ticker bar and lower thirds.
* [[Skedular]]
* [[Skedular]]
* [[P169 Replacement]]
* [[P169 Replacement]]
* [[Net mux Audio Breakout]]
* [[Net mux Audio Breakout]]


None of these have been abandoned, though a couple of them are on hold for a while due to time constraints (as in, not enough of it)
None of these have been abandoned, though a couple of them are on hold for a while due to time constraints (as in, not enough of it)

Navigation menu