0
edits
Dummy User (talk | contribs) No edit summary |
Dummy User (talk | contribs) (Added photos) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
Filmed in the Physics and Electronics Bulding Concourse, using the existing control room and extending all the studio equipment out into the main part of the concourse. | Filmed in the Physics and Electronics Bulding Concourse, using the existing control room and extending all the studio equipment out into the main part of the concourse. | ||
A big event mostly as a training and practice run for the [[Election Night]] coverage. | A big event mostly as a training and practice run for the [[YUSU_Election_Nights|Election Night]] coverage. | ||
{| | |||
|- | |||
| [[Image:CIN1992_1.JPG|thumb|The set]] | |||
| [[Image:CIN1992_2.JPG|thumb|The set and technical setup]] | |||
|- | |||
|} | |||
{{Children In Need}} | {{Children In Need}} | ||
{{YSTV Productions}} | {{YSTV Productions}} | ||
[[Category:Productions]] | [[Category:Productions]] |
edits