Matt Gray: Difference between revisions
Jump to navigation
Jump to search
Dummy User (talk | contribs) No edit summary |
Dummy User (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
* [[Scheduling Manager]] (autumn 2006) | * [[Scheduling Manager]] (autumn 2006) | ||
* [[Network Engineer]] (with [[David Furey]]) (2007AGM - 2008AGM) | * [[Network Engineer]] (with [[David Furey]]) (2007AGM - 2008AGM) | ||
* [[Web Designer]] (2008AGM - 2009AGM) | * [[Web Designer]] (2008AGM - 2009AGM) - came up with the base design for the '08 overhaul (attempt 2) | ||
(Also Chief Engineer of URY, June 2006 - March 2008) | (Also Chief Engineer of URY, June 2006 - March 2008) | ||
The last crusader of the Rediffusion wiring based campus distribution network. | |||
Now works in radio, and is happy to answer any ystv history questions. (contact via website) | |||
== == | == == | ||
Website: http://www.mattg.co.uk | Website: http://www.mattg.co.uk |
Revision as of 02:09, 7 November 2010
Officerships held
- Scheduling Manager (autumn 2006)
- Network Engineer (with David Furey) (2007AGM - 2008AGM)
- Web Designer (2008AGM - 2009AGM) - came up with the base design for the '08 overhaul (attempt 2)
(Also Chief Engineer of URY, June 2006 - March 2008)
The last crusader of the Rediffusion wiring based campus distribution network.
Now works in radio, and is happy to answer any ystv history questions. (contact via website)
Website: http://www.mattg.co.uk