Line 11: | Line 11: | ||
== New cabling == | == New cabling == | ||
In summer 1998 an ambitious 2km of 3-pair plus overall screen cable was installed, following an initial mixup which had seen 2km of 3 core mains cable delivered to the station instead. | In summer 1998 an ambitious 2km of 3-pair plus overall screen cable was installed, following an initial mixup which had seen 2km of 3 core mains cable delivered to the station instead. This would be joined to portions of known good Rediffusion cable, notably the thicker solid core contribution cables in reverse. | ||
Where terminated to the three pairs were assigned | |||
* Red/black: video | * Red/black: video | ||
* Green/black: left or mono audio | * Green/black: left or mono audio |