Distribution Network: Difference between revisions

m
make headings headings
m (just getting going)
m (make headings headings)
Line 1: Line 1:
Original Network
== Original Network ==


When the University was built during the late 60s and early 70s, a closed circuit system of audio visual distribution was installed. The system allowed upto 5 channels to be conveyed around campus on a multipair pair cable, with each channel dedicated to a separate pair. An equipment room LTC (adjacent to Central Hall) acted as the transmission hub.   
When the University was built during the late 60s and early 70s, a closed circuit system of audio visual distribution was installed. The system allowed upto 5 channels to be conveyed around campus on a multipair pair cable, with each channel dedicated to a separate pair. An equipment room LTC (adjacent to Central Hall) acted as the transmission hub.   
Line 8: Line 8:
</gallery>
</gallery>


Vanbrugh Upgrade
== Vanbrugh Upgrade ==


Beyond Vanbrugh
== Beyond Vanbrugh ==
0

edits